Dirt Backfilling Quotes

Get Professional Services

Cost of Dirt Backfilling in Kennewick

The cost of dirt backfilling in Kennewick, WA can vary significantly based on several factors. Whether you're leveling a yard, filling in a trench, or preparing a foundation, understanding the elements that influence the cost is crucial for budgeting your project effectively.

Factors Affecting Cost

  • Type of Dirt: Different types of dirt such as topsoil, clay, or sand have varying costs.
  • Amount of Dirt Needed: The volume of dirt required directly impacts the overall expense.
  • Labor Costs: The hourly rate or project-based fees charged by the contractors.
  • Site Accessibility: Easy-to-access sites may incur lower costs compared to those that are difficult to reach.
  • Equipment Required: The need for specialized machinery can increase the cost.
  • Disposal Fees: Fees associated with disposing of any excess or unwanted dirt.

Average Costs for Common Tasks

Task Description Average Cost (Kennewick, WA)
Basic Backfilling (per cubic yard) $15 - $25
Topsoil Backfilling (per cubic yard) $20 - $35
Labor (per hour) $50 - $75
Equipment Rental (per day) $200 - $400
Disposal Fees (per load) $50 - $100

Dirt Backfilling